Tar Sands 101
The Tar Sands "Gigaproject" is the largest industrial project in human history and likely also the most destructive. The tar sands mining procedure releases at least three times the CO2 emissions as regular oil production and is slated to become the single largest industrial contributor in North America to Climate Change.
The tar sands are already slated to be the cause of up to the second fastest rate of deforestation on the planet behind the Amazon Rainforest Basin. Currently approved projects will see 3 million barrels of tar sands mock crude produced daily by 2018; for each barrel of oil up to as high as five barrels of water are used.
Human health in many communities has seriously taken a turn for the worse with many causes alleged to be from tar sands production. Tar sands production has led to many serious social issues throughout Alberta, from housing crises to the vast expansion of temporary foreign worker programs that racialize and exploit so-called non-citizens. Infrastructure from pipelines to refineries to super tanker oil traffic on the seas crosses the continent in all directions to allthree major oceans and the Gulf of Mexico.
The mock oil produced primarily is consumed in the United States and helps to subsidize continued wars of aggression against other oil producing nations such as Iraq, Venezuela and Iran.
To understand the tar sands in more depth, continue to our Tar Sands 101 reading list
Black Gold, Black Death
Black Gold, Black Death
Oil Sands Frenzy in Canada
http://www.counterpunch.org/holt02042006.html
February 4 / 5, 2006
By JOHN HOLT
Pipeline aimed at tar sands raises green ire
Introductory minirant:
While absolutely correct to be calling the federal government on the final destination of the gas for the MGP, it is problematic to call for the greening of the Mackenzie
Gas Project. The fact is that the MGP is not one pipeline, and the tar sands in Alberta are a possible destination. The tarsands cannot move forward without the MGP-- and seeing the pipeline as a critical component means realising we need to stop the construction of the pipeline period-- regardless of any location being pre-determined for this amount of energy.