Oil Sands Truth: Shut Down the Tar Sands

Peace wants say on massive dam

Peace wants say on massive dam

Region wants consideration before any studies on $6-billion Site C

BY SCOTT SIMPSON, CANWEST NEWS SERVICE
AUGUST 19, 2009

Northeast British Columbia won't yield to B.C. Hydro's Site C mega-hydroelectric project without a fight.

Directors of the Peace River Regional District have voted to recommend the B.C. government reject Hydro's request to undertake geotechnical surveys of potential locations for the estimated $6-billion Site C dam and its reservoir.

Hydro needs the studies -- which will investigate the stability and composition of the earth in the vicinity of the proposed dam site -- as part of preparatory work prior to any decision about whether to proceed with the estimated 900-megawatt project.

It is asking B.C.'s integrated lands management branch for a 10-year licence of occupation for the area.

Hydro already has two dams and reservoirs upstream of Site C.

The district wants "compensation, mitigation and monitoring program measures" undertaken before Hydro is allowed to proceed with any investigative work -- including consideration for the loss of several regional parks, farmland and archeological sites that would be inundated by the creation of a reservoir with a 9,300-hectare surface area.

That's the same position the district took in 1981 when Site C was previously studied in detail -- and Fort St. John Mayor Bruce Lantz noted that although Hydro is engaged in a public consultation process, there has been no action on the region's concerns in the 28 years since that position was taken.

"Nothing has really changed, and Hydro hasn't done anything about it," Lantz said in an interview yesterday. "They've not come forward and talked about mitigation or compensation or any of those issues, and those are fairly important to the people who live and work in the area."

Lantz, a director on the regional district board, said the projected dam and flood areas are "littered with historic, recreational and cultural situations that need to be addressed.

"I'm amazed in this day and age with concerns about food security we are wiping out 5,200 hectares of 'class-one' and 'class-two' agricultural land."

Lantz said a Hydro promise to create a recreational area on the ensuing Site C reservoir is dubious -- noting that during public information meetings last year, Hydro representatives acknowledged that it would take at least 20 years for the slopes of the reservoir to stabilize enough to allow public access.

Peace River South MLA Blair Lekstrom, minister of Energy, Mines and Petroleum Resources, said he was "a little surprised" that regional district members didn't simply "pick up the phone" to ask him about Hydro's intentions.

"This is not about building the dam. This is about the ability to get in on some land and do some test holes, look at core samples to see if there is proper material if the decision ever was made to go ahead," Lekstrom said.

He said it was a "reasonable request" for regional district board members to raise the issue of compensation for the impact of Site C, should it proceed, and that "there are opportunities to look at that."

© Copyright (c) The Victoria Times Colonist

Oilsandstruth.org is not associated with any other web site or organization. Please contact us regarding the use of any materials on this site.

Tar Sands Photo Albums by Project

Discussion Points on a Moratorium

User login

Syndicate

Syndicate content