Oil Sands Truth: Shut Down the Tar Sands

Forests

Forests

Forests lose more trees and habitat to pipeline “right of way” cuts and tar pit building than to clearcuts. With minor variation, pipelines go the direct route. Through the strip mining of the land that contains tarsand petroleum and through pipeline construction to accomodate, only the Amazon Basin in Brazil would see larger rates of deforestation than the Boreal forest cover surrendered to the tarsands. Roads often accompany pipelines, as do various other developments. Hundreds of thousands of miles of forests, all combined, have been lost to infrastructure built to accommodate tarsands operations. Now the industry wants to build two approximately 1200 km long Mackenzie and Gateway pipelines as well as 2700 km's from Alaska's North Slope to accomodate tarsand oil production.

warning: Creating default object from empty value in /var/www/drupal-6.28/modules/taxonomy/taxonomy.pages.inc on line 33.
Forests lose more trees and habitat to pipeline “right of way” cuts and tar pit building than to clearcuts. With minor variation, pipelines go the direct route. Through the strip mining of the land that contains tarsand petroleum and through pipeline construction to accomodate, only the Amazon Basin in Brazil would see larger rates of deforestation than the Boreal forest cover surrendered to the tarsands. Roads often accompany pipelines, as do various other developments. Hundreds of thousands of miles of forests, all combined, have been lost to infrastructure built to accommodate tarsands operations. Now the industry wants to build two approximately 1200 km long Mackenzie and Gateway pipelines as well as 2700 km's from Alaska's North Slope to accomodate tarsand oil production.

Federal Judge changes Dene Tha' ruling: MGP Hearings Resume

This is a setback, and what form of setback is a matter of interpretation. It is a signal that the nations of the North are expected to take a payoff or get steamrolled. It is also an attempt to use the usual doublespeak manner of the Canadian State: not allowing the supreme court ruling to actually effect the economic situation for the Mackenzie Gas Project by delaying the process, but forcing the cosmetic change in the JRP final report. However, it should be noted that decisions on whether or not the MGP goes ahead will come from something other than a federally orchestrated panel.

The Violence of the Letter: Land Claims and Continuing Colonial Conquest in Canada

The Violence of the Letter: Land Claims and Continuing Colonial Conquest in Canada (Peter Kulchyski)

Canadian Dimension Magazine, January/February 2007 Issue

NEB spells out Mackenzie pipeline conditions

What is of concern here is not what is mentioned, but rather what isn't. There are two equally disturbing environmentally dangerous aspects to the proposed pipeline. One cannot be hidden but only minimized and "greenwashed", the other can be lied about, declared irrelevant, or simply left unspoken. The first is what we have discussed by the NEB: land and water protection from both the construction and the operation phases of the MGP. The other is the impact on the overall atmosphere via the transport of the gas to be used in the operation of the Alberta tarsands.

Black Gold, Black Death

Black Gold, Black Death
Oil Sands Frenzy in Canada
http://www.counterpunch.org/holt02042006.html
February 4 / 5, 2006
By JOHN HOLT

Syndicate content
Oilsandstruth.org is not associated with any other web site or organization. Please contact us regarding the use of any materials on this site.

Tar Sands Photo Albums by Project

Discussion Points on a Moratorium

User login

Syndicate

Syndicate content