Imperial's oilsands modules traverse circuitous route
By Dave Cooper, Edmonton Journal October 16, 2010
With Imperial's $8-billion Kearl oilsands project now about 25 per cent complete, the first two South Koreanmade modules have arrived by barge in Lewiston, Idaho, after a 500-kilometre trip from the U.S. West Coast.
A shipload of modules arrived on Oct. 3 at the Port of Vancouver, Wash., across from Portland on the Columbia River. The units were loaded onto barges and towed up the Columbia and Snake rivers to Lewiston.